Starbase activities (2024-11-13):
- Nov 12th cryo delivery tally.
- Nov 12th addendum: Pad A photos from Starship Gazer. (Ship 31, nose test tiles, launch mount, aft flaps being secured)
- Build site: Overnight, all three of S34's outer transfer tubes are lifted to the installation jig in Megabay 2. (ViX)
- Booster transport stand arrives at the build site and enters Megabay 1. (ViX)
- B13 is transferred onto the transport stand and emerges from Megabay 1 in preparation for rollout. (ViX 1, ViX 2 (employee photo op), LabPadre, Starship Gazer, Golden 1, Golden 2, clwphoto1, NSF livestream)
- B16's A5:4 section is staged outside Megabay 1. (ViX, Gisler 1, Gisler 2)
- cnunez posts a photo of three nosecones in Starfactory, likely for S35, S36, and S37.
- Office construction continues. Application of the SpaceX logo begins. (ViX 1, ViX 2, ViX 3, Gisler)
- Pad B: The LR11000 is being prepared to be laid down prior to IFT-6. (ViX)
- Pad A: S31 has a banana on each side. (Gisler, cnunez)
- 14-hour road closures are posted for Nov 18th, 19th, and 20th (all 08:00 to 22:00), for flight testing activities, presumably IFT-6.
- NOTAM and NOTMAR are posted for IFT-6.
McGregor:
- A Raptor 3 has a hard start a rough start on the horizontal stand. (Hayden / NSF)