this post was submitted on 02 Nov 2024
9 points (80.0% liked)

SpaceX

1943 readers
20 users here now

A community for discussing SpaceX.

Related space communities:

Memes:

founded 1 year ago
MODERATORS
 

SpaceX Starship page

Portions of this thread copied from a Starship Dev thread on r/SpaceX.

FAQ

  1. When next launch? (IFT-6) SpaceX announce November 18th as the NET date for flight 6, and post info on mission objectives and changes since flight 5.
  2. When previous launch? (IFT-5)? Booster 12 and Ship 30 launched on 2024-10-13.
  3. What was the result? Booster caught by chopsticks, ship makes an on-target splashdown.

Quick Links

Nerdle Cam | Lab Cam | Sapphire Cam | Sentinel Cam | Rover Cam | Rover 2.0 Cam | Rocket Ranch Cam | Plex Cam | NSF Starbase Live

Starship Dev October | IFT-5 launch thread | Starship Dev 57 | Starship Dev 56 | IFT-4 launch thread | Starship Dev 55

Official SpaceX Starship Update Video (2024-04-06)


Road closures

Cameron County website - @bocaroad Mastodon bot

*As of 2024-11-09

  • 2-hour road delays are posted for Nov 1st (01:00 to 04:00) and 2nd (00:00 and 03:00) for transport from Massey’s to factory. (Presumably S33 rollback)
  • 1-hour road delays are posted for Nov 11th (19:00 to 22:00) and 12th (10:00 to 13:00) for transport from factory to pad, likely B13 rollout.
  • 1-hour road delays are posted for Nov 13th (00:00 to 03:00 or 12:00 to 15:00) and 14th (00:00 to 03:00) for transport from factory to pad, either backups for B13 rollout or for S31 rollout.

Vehicle Status

*As of 2024-11-09

Follow Ring Watchers on Twitter and Discord for more.

Ship Location Status Comment
S20 Rocket Garden Pending scrapping?
S26 Rocket Garden Pending scrapping? Static fire Oct. 20. No fins or heat shield, multiple mysterious changes. Completed 3 cryo tests, latest on Oct 10. Rolls to Massey's May 8th, cryo test May 24th, static fired Jun 3rd, rolls to rocket garden Jun 12th. Moves to Megabay 2 Aug 13th, raptors removed Aug 14th.
S30 Indian Ocean Successful splashdown 2x cryo: Jan 3rd and Jan 5th. Engines installed ~Apr 9th. Static fired May 8th. Heatshield replacement completed by Jul 20. Static fired Jul 26th. Raptor replacement Aug 3rd. Spin prime Aug 6th. Full stack cryo tests Sep 23rd and Oct 7th. FTS installed Oct 9th. Launched Oct 13th, with on-target splashdown in Indian Ocean.
S31 Launch site Pending FTS install. Cryo tested May 12th, suffers small electrical fire. Underwent repairs in the Highbay, rolls back to Massey's Jul 1. Cryo tested Jul 2nd and 3rd. Engines installed by Jul 26th. Rolls to Massey's Sep 6th. Partial (aborted) cryo test Sep 8th. Static fired Sep 18th.
S32 Rocket Garden Pending scrapping? Fully stacked, fore flaps installed but not aft flaps
S33 Megabay 2 Pending engine install First V2 Starship. Nosecone spotted Jul 14th. Forward section spotted Jul 27th. Stacking completed Aug 23. Cryo tested Oct 29th (partial), 30th (full), and 31st (full). Raptor installation begins Nov 9th.
S34 Starfactory Stacking Methane header tank spotted Aug 14th. Nosecone stacked on payload bay Sep 20th.
S35 Starfactory Parts spotted Parts spotted Sep 20th.
Booster Location Status Comment
B12 Megabay 1 Post-flight inspection Cryo x2, Static fire Jul 15th. Full stack cryo tests Sep 23rd and Oct 7th. FTS installed Oct 9th. Launched as IFT-5 on Oct 13, returned to launch site for successful chopstick catch. Moved to Megabay 1 Oct 15th.
B13 Megabay 2 Resting Cryo tests Apr 26th (methane tank) and Apr 29th (LOX tank). Static fired Oct 24th.
B14 Megabay 1 Cryo testing Stacked Apr 26th, Cryo tested Oct 4th and 5th.
B14.1 Sanchez Resting Multiple catch simulation "slap tests" performed on Jun 26th and 27th.
B15 Build Site Assembly Potential aft end, common dome section, aft tank section, and forward dome spotted.
B16 Build Site Assembly Parts spotted
B17 Build Site Assembly Parts spotted

Resources

top 14 comments
sorted by: hot top controversial new old
[–] threelonmusketeers 4 points 1 day ago

Starbase activities (2024-11-12):

Other:

[–] threelonmusketeers 5 points 1 day ago

Starbase activities (2024-11-11):

[–] threelonmusketeers 4 points 2 days ago* (last edited 23 hours ago)

Starbase activities (2024-11-10):

  • Nov 9th cryo delivery tally.
  • Nov 9th addendum: S31 moves out of the corner of Highbay. (ViX)
  • Sanchez: Launch mount B construction continues. The fourth and final side section is delivered. (ViX)
  • Build site: All six of S33's raptors have now arrived at Megabay 2. "In sequence, we had RV275, RV305, RC385, RC345, RC316 and RV398." (ViX)
  • cnunez posts recent photos of S31 and chopsticks carriage for Pad B.
  • RGV Aerial post a recent flyover photo of Pad B / Pad West.

Other:

  • Chinese launch startup Cosmoleap are already testing their own prototype tower and chopsticks hardware. (CNSpaceflight)
[–] threelonmusketeers 4 points 4 days ago* (last edited 4 days ago)

Starbase activities (2024-11-09):

Other:

[–] threelonmusketeers 4 points 5 days ago

Starbase activities (2024-11-08):

  • Nov 7th cryo delivery tally.
  • Sanchez: Launch mount B construction continues. The third (of four) side sections is lifted into position. (ViX)
  • Build site: Overnight, scaffolding is removed from S31. (ViX)
  • Hot stage adapter moves from Starfactory towards Megabay 1. (ViX 1, ViX 2)
  • CO2 tank is lifted, presumably up to B13. (ViX)
  • Boxes labeled SN1 and SN2 are spotted. (LabPadre)
  • Two SPMTs arrive at the build site. The LTR1220 crane shifts some of the counterweights, and the SPMTs enter the Highbay. (ViX 1, ViX 2)
  • cnunez posts a recent photo of a partially tiled nosecone in Starfactory.
  • Pad A: The chopsticks and the ship quick disconnect are tested. (ViX 1, ViX 2, ViX 3)
  • Pad B: The LR11000 crane removes a net from Tower B. (ViX)
  • 1-hour road delays are posted for Nov 13th (00:00 to 03:00 or 12:00 to 15:00) and 14th (00:00 to 03:00) for transport from factory to pad, either backups for B13 rollout or for S31 rollout.

McGregor:

Other:

[–] UniversalMonk 4 points 5 days ago (1 children)

Awesome post, OP. Thank you!!

[–] threelonmusketeers 4 points 5 days ago

You're welcome! Glad to know it is appreciated!

[–] threelonmusketeers 5 points 6 days ago* (last edited 5 days ago)

Starbase activities (2024-11-07):

  • Nov 6th cryo delivery tally.
  • Pad A: The remaining subcooler is lifted into position. (ViX, Gisler)
  • Work on chopsticks continues. Workers observed on the booster quick disconnect. (cnunez, ViX)
  • Pad B: CC8800-1 disassembly continues. Six truckloads depart from the launch site. (ViX, Gisler 1, Gisler 2)
  • Build site: Scaffolding is delivered, glass installation continues on the passageway between Starfactory and offices. (ViX)
  • Two new semi-circular work platforms arrive at Megabay 2. (ViX)
  • Booster CO2 tank moves from Starfactory towards Megabay 1. (ViX)
  • Hotstage ring spotted outside Megabay 1. (Anderson / LabPadre)
  • S31 receives a "banana for scale" sticker. (Starship Gazer, Mary, Gisler, cnunez, Ramirez)
  • Sanchez: Launch mount B construction continues. The GMK 7550 crane lifts the first and second (of four) side sections into position. (ViX 1, ViX 2, ViX 3)
  • Rocket Garden: Counterweights are added to SPMTs, likely in preparation for B13 rollout. (ViX)
  • 1-hour road delays are posted for Nov 11th (19:00 to 22:00) and 12th (10:00 and 13:00) for transport from factory to pad, likely B13 rollout.

McGregor:

  • The tripod stand is being retired. Some tanks are removed. (NSF)
[–] threelonmusketeers 5 points 6 days ago* (last edited 6 days ago)

Starbase activities (2024-11-06):

  • Nov 5th cryo delivery tally.
  • Pad B: CC8800-1 crane disassembly continues. Two more truckloads of parts depart. (ViX, NSF 1, NSF 2, NSF 3, Gisler 1, Gisler 2, Gisler 3)
  • RGV Aerial post a recent flyover photo of the launch site.
  • Some sort of box/cover is lifted into place at the tank farm. (clwphoto1)
  • Construction on passageway between Starfactory and offices continues. Window installation in progress. (Gisler)
  • Build site: The A4:4 LOX section for B16 moves from Starfactory to Megabay 1. (ViX)
  • Sanchez: Construction continues on launch mount B. All four corner sections are in place. (ViX 1, ViX 2)
  • The pez load has shrunk. (ViX)

IFT-6:

  • FAA NOTAMN is posted for Nov 18th through 26th. (LabPadre)

  • SpaceX announce November 18th as the NET date for flight 6, and post info on mission objectives and changes since flight 5. Highlights:

    Hardware upgrades for this flight add additional redundancy to booster propulsion systems, increase structural strength at key areas, and shorten the timeline to offload propellants from the booster following a successful catch. Mission designers also updated software controls and commit criteria for the booster’s launch and return.

    An additional objective for this flight will be attempting an in-space burn using a single Raptor engine, further demonstrating the capabilities required to conduct a ship deorbit burn prior to orbital missions.

    The flight test will assess new secondary thermal protection materials and will have entire sections of heat shield tiles removed on either side of the ship in locations being studied for catch-enabling hardware on future vehicles. The ship also will intentionally fly at a higher angle of attack in the final phase of descent, purposefully stressing the limits of flap control to gain data on future landing profiles. Finally, adjusting the flight’s launch window to the late afternoon at Starbase will enable the ship to reenter over the Indian Ocean in daylight, providing better conditions for visual observations.

[–] threelonmusketeers 6 points 1 week ago* (last edited 1 week ago)

Starbase activities (2024-11-01):

Other:

  • NSF article on pending upgrades to Starship facilities in Florida.
  • Additional highlight summaries on Starship HLS mockup from Kirtland, Bickmore, and Li. Two floors, five bedrooms, laboratory, airlock, life support, four control seats, and a 40-foot ceiling in one area.
[–] threelonmusketeers 4 points 1 week ago* (last edited 1 week ago)

Starbase activities (2024-11-05):

McGregor:

Other:

  • mcrs987 notes that one of the aluminum-coated tiles on IFT-5 was glowing/melting. (Tweet 1, tweet 2)
[–] threelonmusketeers 4 points 1 week ago* (last edited 1 week ago)

Starbase activities (2024-11-04):

Other:

[–] threelonmusketeers 4 points 1 week ago

Starbase activities (2024-11-03):

Cape Canaveral activities:

[–] threelonmusketeers 4 points 1 week ago

Starbase activities (2024-11-02):

Other: