submitted 4 months ago* (last edited 1 month ago) by threelonmusketeers to c/spacex
 

SpaceX Starship page

Portions of this thread copied from a Starship Dev thread on r/SpaceX.

FAQ

  1. When next launch? (IFT-5) Booster catch is now NET late November, per SpaceX.
  2. When previous launch? (IFT-4)? Booster 11 and Ship 29 launched on 2024-06-06.
  3. What was the result? Both booster and ship make it to landing burn and splashdown. Ship flaps took a beating on reentry, but remained in control of the vehicle.

Quick Links

RAPTOR ROOST | LAB CAM | SAPPHIRE CAM | SENTINEL CAM | ROVER CAM | ROVER 2.0 CAM | PLEX CAM | NSF STARBASE

Starship Dev 56 | IFT-4 launch thread | Starship Dev 55 | IFT-3 launch thread | Starship Dev 54 | Starship Dev 53 | Starship Dev 52

Official SpaceX Starship Update Video (2024-04-06)


Status

Road Closures - @bocaroad Mastodon bot

Type Start (CDT) End (CDT) Status
Primary Date 2024-07-09 08:00 2024-07-09 20:00 Possible Closure.
Backup Date 2024-07-10 08:00 2024-07-10 20:00 Possible Closure.
Backup Date 2024-07-11 08:00 2024-07-11 20:00 Possible Closure.
Backup Date 2024-07-10 12:00 2024-07-11 00:00 "Clossure" Scheduled.
Backup Date 2024-07-11 12:00 2024-07-12 00:00 Possible "Clossure".
Primary Date 2024-07-12 08:00 2024-07-12 20:00 Possible "Clossure".

Up to date as of 2024-07-11

Vehicle Status

As of 2024-08-23

Follow Ring Watchers on Twitter and Discord for more.

Ship Location Status Comment
S20 Rocket Garden Pending scrapping?
S26 Rocket Garden Pending scrapping? Static fire Oct. 20. No fins or heat shield, multiple mysterious changes. Completed 3 cryo tests, latest on Oct 10. Rolls to Massey's May 8th, cryo test May 24th, static fired Jun 3rd, rolls to rocket garden Jun 12th. Moves to Megabay 2 Aug 13th, raptors removed Aug 14th.
S30 Stacked on B12 Static fired Jul 26th 2x cryo: Jan 3rd and Jan 5th. Engines installed ~Apr 9th. Static fired May 8th. Heatshield replacement completed by Jul 20. Static fired Jul 26th. Raptor replacement Aug 3rd. Spin prime Aug 6th.
S31 Highbay Resting Cryo tested May 12th, suffers small electrical fire. Underwent repairs in the Highbay, rolls back to Massey's Jul 1. Cryo tested Jul 2nd and 3rd. Engines installed by Jul 26th. Rolls to Massey's Sep 6th. Partial (aborted) cryo test Sep 8th. Static fired Sep 18th.
S32 Rocket Garden On the move Fully stacked, fore flaps installed but not aft flaps
S33 Megabay 2 Pending flaps install First V2 Starship. Nosecone spotted Jul 14th. Forward section spotted Jul 27th. Stacking completed Aug 23.
S34 Starfactory Stacking Methane header tank spotted Aug 14th. Nosecone stacked on payload bay Sep 20th.
S35 Starfactory Parts spotted Parts spotted Sep 20th.
Booster Location Status Comment
B12 Launch Mount A Pending hot stage ring install Cryo x2, Static fire Jul 15th.
B13 Megabay 1 Testing Cryo tests Apr 26th (methane tank) and Apr 29th (LOX tank)
B14 Megabay 1 Pending cryo Stacked Apr 26th
B14.1 Sanchez Resting Multiple catch simulation "slap tests" performed on Jun 26th and 27th.
B15 Build Site Assembly Potential aft end, common dome section, aft tank section, and forward dome spotted.
B16 Build Site Assembly Parts spotted
B17 Build Site Assembly Parts spotted

Resources

top 50 comments
sorted by: hot top controversial new old
[–] threelonmusketeers 8 points 4 months ago

Starbase activities (2024-07-11):

Other:

[–] threelonmusketeers 7 points 2 months ago

Starbase activities (2024-08-24):

[–] threelonmusketeers 7 points 2 months ago

Starbase activities (2024-08-22):

[–] threelonmusketeers 6 points 4 months ago* (last edited 4 months ago)

This thread maybe, next thread definitely!

Starbase activities (2024-07-10):

Other:

  • Recent Starship Gazer videos on Tower B construction and S30 heat shield replacement.
  • SpaceX publicly responds to a NYT article on the affects of Starbase on piping plover populations. It is somewhat unusual to see an official SpaceX social media account used in this manner. Anyone else remember any similar examples?
[–] threelonmusketeers 6 points 2 months ago

Starbase activities (2024-08-30):

[–] threelonmusketeers 6 points 2 months ago* (last edited 2 months ago)

Starbase activities (2024-08-31):

Other:

[–] threelonmusketeers 6 points 2 months ago

Starbase activities (2024-09-03):

[–] threelonmusketeers 6 points 2 months ago

Starbase activities (2024-09-04):

  • Sep 3rd cryo delivery tally.
  • Sep 3rd addendum: Starhopper relocation timelapse. (ViX)
  • Overnight, chopstick rails are tested again. (ViX)
  • Chopsticks work continues. (cnunez) Ship lifting pin is reinstalled on the port-side chopstick. (ViX 1, ViX 2)
  • Starboard-side pin may have been reinstalled. (ViX)
  • Welding on chopstick bumpers. (Hammer)
  • Documentary interview being filmed on chopsticks? (Hammer)
  • Starhopper's new home. (ViX)
  • SPMTs arrive at the build site, likely for S31.
  • 2-hour road delay is posted for 2024-09-06 between 00:00 and 03:00 for transport from Megabay to Massey's.
[–] threelonmusketeers 6 points 3 months ago* (last edited 3 months ago)

Starbase activities (2024-07-25):

Other:

[–] threelonmusketeers 6 points 4 months ago* (last edited 4 months ago)

Starbase activities (2024-07-12):

Other:

[–] threelonmusketeers 6 points 4 months ago
[–] threelonmusketeers 6 points 3 months ago

Starbase activities (2024-08-05):

McGregor:

[–] threelonmusketeers 6 points 3 months ago

Starbase activities (2024-08-06):

[–] threelonmusketeers 6 points 2 months ago

Starbase activities (2024-08-20):

  • Aug 19th cryo delivery tally.
  • Aug 19th addendum: Video of S33 downcomer and jig entering Megabay 2. (ViX)
  • In the morning, the LOX downcomer enters Megabay 2 as well. (ViX)
  • Build site video tour.
  • Construction on offices and connecting passageway to Starfactory continues, and the two structures are now connected. (Gisler 1, Gisler 2)
  • Pad A: A "burn plate" is lifted onto booster quick disconnect hood, and tower cladding is being added/replaced. (ViX 1, ViX 2)
  • Pad B: Elevator sections 7 and 8 are lifted. (LabPadre, ViX 1, ViX 2)
  • Crews are prepping tower module 9 for its upcoming lift. (Gisler)
  • Tanks which arrived at Brownsville port on Aug 18th are arriving at Massey's. (LabPadre)
  • Test Tank 16 still at Massey's.
[–] threelonmusketeers 6 points 3 months ago

Starbase activities (2024-08-07):

[–] threelonmusketeers 6 points 3 months ago

Starbase activities (2024-08-08):

Other:

[–] threelonmusketeers 6 points 4 months ago

Starbase activities (2024-07-15):

[–] threelonmusketeers 6 points 3 months ago* (last edited 3 months ago)

Starbase activities (2024-07-16):

Other:

[–] threelonmusketeers 6 points 3 months ago

Starbase activities (2024-07-17):

[–] threelonmusketeers 6 points 2 months ago

Starbase activities (2024-08-19):

McGregor activities (2024-08-19):

  • Possible second Raptor 3 test fire, lasting 169 seconds, which matches full duration burn of Super Heavy. (NSF)
[–] threelonmusketeers 6 points 2 months ago

Starbase activities (2024-08-21):

Other:

  • Compilation of Tower B stacking. (LabPadre)
[–] threelonmusketeers 5 points 3 months ago

Starbase activities (2024-08-12):

[–] threelonmusketeers 5 points 3 months ago

Starbase activities (2024-08-02):

Other:

[–] threelonmusketeers 5 points 3 months ago* (last edited 3 months ago)

Starbase activities (2024-08-03):

  • Aug 2nd cryo delivery tally.
  • Overnight, ship lifting jig enters Megabay 2. Another B15 3-ring section is moved to Megabay 1.
  • Pad B: Module 6 is lifted. (LabPadre, ViX, NSF 1, NSF 2, Gisler)
  • Load spreader is lowered. It is thought that the CC8800-1 crane needs to be reconfigured to allow stacking of the next tower module.
  • Build site: S30 moves from Sanchez to Megabay 2, and is lifted onto the back left work stand. (LabPadre, ViX, Gisler, clwphoto1)
  • R-Vac #398 is removed from S30, and #384 looks to be its replacement (LabPadre, ViX)
  • Office window installation continues (Gisler)

Other:

[–] threelonmusketeers 5 points 3 months ago

Starbase activities (2024-08-04):

[–] threelonmusketeers 5 points 1 month ago* (last edited 1 month ago)

Starbase activities (2024-09-29):

Maritime:

  • HOS Ridgewind is back at the B11 splashdown site. (Cornwell)

Other:

[–] threelonmusketeers 5 points 3 months ago

Starbase activities (2024-08-13):

[–] threelonmusketeers 5 points 3 months ago

Starbase activities (2024-08-14):

[–] threelonmusketeers 5 points 2 months ago* (last edited 2 months ago)

Starbase activities (2024-08-15):

Other:

Edit: Fixed incorrect road closure dates, and clarified S33 section.

[–] threelonmusketeers 5 points 3 months ago

Starbase activities (2024-07-18):

Other:

[–] threelonmusketeers 5 points 2 months ago

Starbase activities (2024-08-28):

  • Aug 27th cryo delivery tally.
  • Aug 27th addendum: 4 more catch bumper pads are installed on the port-side chopstick, bringing the total to 5.
  • Starkitty spotted :)
  • Pad A chopsticks work continues. (NSF, Gisler)
  • Pad B flame trench work continues. (Gisler)
  • Office construction continues. (Gisler 1, Gisler 2, Gisler 3)
  • Nice photo of the Rocket Garden and Sanchez site, with S??, S32, S26, S30, B14.1. (Hammer)
  • Test Tank 16 is in the "can crusher" testing apparatus at Massey's. (Gisler)
[–] threelonmusketeers 5 points 2 months ago

Starbase activities (2024-08-27):

McGregor activities (2024-08-27):

[–] threelonmusketeers 5 points 2 months ago

Starbase activities (2024-08-29):

[–] threelonmusketeers 5 points 3 months ago

Starbase activities (2024-07-20):

Starbase activities (2024-07-21):

Other:

[–] threelonmusketeers 5 points 1 month ago* (last edited 1 month ago)

Starbase activities (2024-09-30):

McGregor:

[–] threelonmusketeers 5 points 2 months ago* (last edited 2 months ago)

Starbase activities (2024-09-01):

  • Aug 30th addendum: B15 final forward section (part of the methane tank) moves to Megabay 2. (ViX 1, ViX 2)
  • Chopsticks work continues. (cnunez)
  • The full complement of 17 bumper pads on each chopstick has now been installed. (LabPadre 1, LabPadre 2)
  • Scaffolding spotted on the exterior of Tower A. (clwphoto1 1, clwphoto1 2)
  • Video tour of new hardware on Starhopper. (ViX)
[–] threelonmusketeers 5 points 2 months ago

Starbase activities (2024-09-02):

[–] threelonmusketeers 5 points 3 months ago* (last edited 3 months ago)

Starbase activities (2024-07-19):

Edit: Pez loader, not dispenser.

[–] threelonmusketeers 5 points 2 months ago* (last edited 2 months ago)

Starbase activities (2024-08-18):

[–] threelonmusketeers 5 points 2 months ago

Starbase activities (2024-09-06):

  • No Sep 5th cryo delivery tally.
  • Sep 5th addendum: Compilation timelapses of chopstick tests, including a full launch rehearsal from BQD retraction to chopsticks catch. (ViX, NSF 1, NSF 2) When the chopsticks are at the top of the tower, their momentum causes a noticeable amount of tower sway. (Anderson)
  • Build site: Overnight, S31 moves to Massey's. (LabPadre, ViX, Starship Gazer photo, Starship Gazer video, NSF, NSF video, Beyer, Gisler, Doherty)
  • Pad A: Chopsticks testing continues. Chopsticks close, landing rails rise, landing rails lower.
  • Pad B: The CC8800-1 crane is laid down. (ViX, Hammer)
  • Massey's: Crews were spotted at Test Tank 16. (Hammer)
[–] threelonmusketeers 5 points 3 months ago* (last edited 3 months ago)

Starbase activities (2024-07-24):

Other:

[–] threelonmusketeers 5 points 1 month ago (2 children)

Starbase activities (2024-09-28):

  • Pad A: S30 still stacked on B12, not launching. (Gisler, cnunez, clwphoto1)
  • S30 missing a couple tiles. Possibly intentional like last time? (Gisler)
  • S32 moves from the Rocket Garden. (Gisler)
  • Work on the passage between Starfactory and offices continues. (Gisler, BocasBrain)
  • Build site wide shot. (Gisler)

Maritime:

  • Hos Ridgewind heads back out into the Gulf. (Cornwell)
load more comments (2 replies)
[–] threelonmusketeers 5 points 3 months ago

Starbase activities (2024-07-26):

[–] threelonmusketeers 5 points 3 months ago

Starbase activities (2024-07-27):

Other:

[–] threelonmusketeers 5 points 2 months ago* (last edited 2 months ago)

Starbase activities (2024-09-05):

[–] threelonmusketeers 5 points 2 months ago* (last edited 2 months ago)

Starbase activities (2024-08-23):

  • Aug 22nd cryo delivery tally.
  • S33 aft section moves from Starfactory to Megabay 2, notably very little heat shielding. (LabPadre, ViX, Mary)
  • Aft section is mated with rest of ship. (Starship Gazer, Golden)
  • New stringers observed on the nose of S33. (Golden)
  • Raptors #349, #373, #348 and #366 are delivered. (Mary)
  • Pad B: The ~~LR11000~~ CC8800-1 crane working on assembly and installation of a catch net on Tower B. (ViX)
  • Some large pipes are delivered. (clwphoto1)

Other:

  • 1-hour reflight turnaround time for Starship is still the goal. Unclear if this is for the booster, the ship, or both. Booster would probably be easier.

Edit: Fixed incorrect crane at Pad B.

[–] threelonmusketeers 5 points 4 months ago* (last edited 4 months ago)

Starbase activities (2024-07-13):

[–] threelonmusketeers 4 points 2 months ago* (last edited 1 month ago)

Starbase activities (2024-09-13):

[–] threelonmusketeers 4 points 3 months ago* (last edited 3 months ago)

Starbase activities (2024-07-29):

Other:

[–] threelonmusketeers 4 points 3 months ago

Starbase activities (2024-07-22):

load more comments