this post was submitted on 05 Aug 2024
15 points (94.1% liked)

Spaceflight

610 readers
45 users here now

Your one-stop shop for spaceflight news and discussion.

All serious posts related to spaceflight are welcome! JAXA, ISRO, CNSA, Roscosmos, ULA, RocketLab, Firefly, Relativity, Blue Origin, etc. (Arca and Pythom, if you must).

Other related space communities:

Related meme community:

founded 1 year ago
MODERATORS
 

The Cygnus spacecraft has completed two delta velocity burns, and it remains on track for a capture by the space station’s robotic arm slated for 3:10 a.m. on Tuesday, Aug. 6. The spacecraft is in a safe trajectory, and all other systems are operating normally.

Shortly after launch on Sunday, the spacecraft performed as designed by cancelling a scheduled engine burn due to a slightly low initial pressure reading flagged by the Cygnus onboard detection system. Engineers at Northrop Grumman’s mission control center in Dulles, Virginia evaluated the pressure reading, confirmed it was acceptable and re-worked the burn plan to arrive at the space station on the originally planned schedule.

you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 1 points 3 months ago

Yikes, does that say a single stick solid booster for the first stage? Seems like it'd be a rough ride up.