this post was submitted on 26 Apr 2024
93 points (96.0% liked)

Space

8347 readers
256 users here now

Share & discuss informative content on: Astrophysics, Cosmology, Space Exploration, Planetary Science and Astrobiology.


Rules

  1. Be respectful and inclusive.
  2. No harassment, hate speech, or trolling.
  3. Engage in constructive discussions.
  4. Share relevant content.
  5. Follow guidelines and moderators' instructions.
  6. Use appropriate language and tone.
  7. Report violations.
  8. Foster a continuous learning environment.

Picture of the Day

The Busy Center of the Lagoon Nebula


Related Communities

๐Ÿ”ญ Science

๐Ÿš€ Engineering

๐ŸŒŒ Art and Photography


Other Cool Links

founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[โ€“] [email protected] 13 points 4 months ago (3 children)

Why get there economically when you can get there for ten times the price?

[โ€“] [email protected] 8 points 4 months ago (1 children)

They want redundancy. What if Musk goes crazy in a new direction and decides to retire Dragon.

[โ€“] [email protected] 2 points 4 months ago (1 children)

They should have thought of redundancy for the HLS. For one, you have a space fuel depot with cryogenic boil off that has to be refilled by multiple (at least 12?) starships. And then you have a slender long full rocket stage that has to land vertically on soft and unprepared lunar regolith. For some reason, my engineering instincts are revolting just at the thoughts of it.

[โ€“] threelonmusketeers 2 points 4 months ago

They should have thought of redundancy for the HLS

NASA wanted redundancy, and will eventually get it.

2020: https://arstechnica.com/science/2020/04/nasa-awards-lunar-lander-contracts-to-blue-origin-dynetics-and-starship/

NASA announced Thursday that it has awarded three contracts to begin initial development of lunar landing systems that will take astronauts down to the surface of the Moon in less than five years.

2021: https://arstechnica.com/science/2021/04/nasa-selects-spacex-as-its-sole-provider-for-a-lunar-lander/

About a year ago, NASA gave initial study and preliminary development contracts for Moon landers to SpaceX, Dynetics, and a team of aerospace heavyweights led by Blue Origin. The cost of SpaceX's bid was about half that of Dynetics, and one-fourth the amount received by Blue Origin. That frugality, at least in part, led NASA on Friday to choose SpaceX as the sole provider of landing services during the down-select phase.

SpaceX is the only affordable option, but BO makes a fuss: https://arstechnica.com/science/2021/08/heres-why-blue-origin-thinks-it-is-justified-in-continuing-to-protest-nasa/

2023: https://arstechnica.com/space/2023/05/blue-origin-wins-pivotal-nasa-contract-to-develop-a-second-lunar-lander/

NASA on Friday announced its selection of Blue Origin to build a second Human Landing System for its Artemis program to return to the Moon. The space company, founded by Jeff Bezos, will lead the development of a fully reusable lander that could take flight as soon as the end of this decade.

Friday's announcement represents a significant moment for NASA for multiple reasons. Importantly, it adds a second provider of human landing services. Previously, NASA awarded a contract to SpaceX for its Starship vehicle to serve as a lunar lander. That vehicle will be used for NASA's first two lunar landing missions, Artemis III and Artemis IV. So NASA gets the competition it covets, which has been shown to spur commercial development.

[โ€“] [email protected] 7 points 4 months ago

They could shoot the occupants for free. Same glorious Boeing (tm) results fo no money.

[โ€“] [email protected] 1 points 4 months ago

They could probably get the human up there in 10 smaller cheaper launches for the same result.