this post was submitted on 08 Sep 2023
228 points (94.2% liked)
Asklemmy
43963 readers
1231 users here now
A loosely moderated place to ask open-ended questions
Search asklemmy π
If your post meets the following criteria, it's welcome here!
- Open-ended question
- Not offensive: at this point, we do not have the bandwidth to moderate overtly political discussions. Assume best intent and be excellent to each other.
- Not regarding using or support for Lemmy: context, see the list of support communities and tools for finding communities below
- Not ad nauseam inducing: please make sure it is a question that would be new to most members
- An actual topic of discussion
Looking for support?
Looking for a community?
- Lemmyverse: community search
- sub.rehab: maps old subreddits to fediverse options, marks official as such
- [email protected]: a community for finding communities
~Icon~ ~by~ ~@Double_[email protected]~
founded 5 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
You still need rubber wheels when it's stopped and at low speed. They retract when it's fast enough for the maglev to take over.
The electrical conductors are expensive as shit. The ones in the train need to be super cooled or something. The track ones need to be built along the entire length. On three sides, one vertically and two horizontally. Along with massive power lines along the whole length. They don't need to move to be expensive.
The right of way needs to be very straight. So compared to normal high speed, you have to spend much more on buying land, earth moving, tunneling, etc.
All this needs to be maintained to an extremely high degree because you can't accept a failure. The engine on a high speed rail fails and you just slow down, no biggie. HSR track is fairly robust and can easily be inspected visually. Since it has the same base as normal passenger and freight you have an entire industry knowledge and inspection machines. Any part of maglev fails and you have a catastrophic failure.
maglevs arent using fuckin superconducters to levitate, it's basic magnetic repulsion. Get whatever fictional version you've got in your head cleared up.
They absolutely can, the one currently being built in Japan does: http://www.ejrcf.or.jp/jrtr/jrtr68/pdf/14-25.pdf page 19-20
Both of you guys are correct, because there are two types of maglev trains; the Japanese tech (Shinkansen) and the German design (trans rapid).
I didn't even know Germany designed maglev train tech, usually when these trains are mentioned it's related to Japan or China. Interesting
The Germans built a maglev test track over 20 years ago
In case you wanna read more about how it failed: https://en.wikipedia.org/wiki/Lathen_train_collision
The Chinese maglev IS the German Transrapid. The Chinese donβt have the mental horsepower too design this kind of stuff
Here's the one I was thinking of, superconducting magnets for the japanese one SCMaglev https://youtu.be/XjwF-STGtfE?si=jrnttpIrmHBXMtUF
Bit savage but your phrasing just cracked me properly up in public