this post was submitted on 13 Jun 2024
422 points (98.6% liked)

Technology

59979 readers
3161 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 2 years ago
MODERATORS
 

Intel's 916,000-pound shipment is a "cold box," a self-standing air-processor structure that facilitates the cryogenic technology needed to fabricate semiconductors. The box is 23 feet tall, 20 feet wide, and 280 feet long, nearly the length of a football field. The immense scale of the cold box necessitates a transit process that moves at a "parade pace" of 5-10 miles per hour. Intel is taking over southern Ohio's roads for the next several weeks and months as it builds its new Ohio One Campus, a $28 billion project to create a 1,000-acre campus with two chip factories and room for more. Calling it the new "Silicon Heartland," the project will be the first leading-edge semiconductor fab in the American Midwest, and once operational, will get to work on the "Angstrom era" of Intel processes, 20A and beyond.

I don't know why, but I've never thought of the transport logistics involved in building a semiconductor fabrication plant.

you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] -1 points 6 months ago (2 children)

I wonder why they don't move this in chunks and assemble them locally. A transport like this must cost a gazillion.

[–] [email protected] 17 points 6 months ago (2 children)

I'm assuming because they can't.

[–] [email protected] 8 points 6 months ago

Yeah if I had to guess a lot of components need to be assembled/put together in a clean room. Then to keep everything "clean", mine as well just assemble it all in one place, which isn't likely doable on site.

[–] [email protected] 0 points 6 months ago

No, really??!!

[–] [email protected] 6 points 6 months ago

This is moving it in chunks.