this post was submitted on 28 Mar 2024
236 points (94.4% liked)

Rust

6137 readers
9 users here now

Welcome to the Rust community! This is a place to discuss about the Rust programming language.

Wormhole

[email protected]

Credits

  • The icon is a modified version of the official rust logo (changing the colors to a gradient and black background)

founded 2 years ago
MODERATORS
 

Slide with text: “Rust teams at Google are as productive as ones using Go, and more than twice as productive as teams using C++.”

In small print it says the data is collected over 2022 and 2023.

you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 15 points 9 months ago (1 children)

Eww... you're probably right. TIHI.

On a related note, I've always preferred t-shirt sizing over story points. You can still screw that up by creating a conversion chart to translate t-shirt sized into hours (or worse, man-hours) or story points, but at least it's slightly more effort to get wrong than the tantalizingly linear numeric looking story points.

If I was truly evil I'd come up with a productivity unit that used nothing but irrational constants.

"Hey Bob, how much work do you think that feature is?"

"Don't know man, I think maybe e, but there's a lot there so it might end up being π."

[–] [email protected] 11 points 9 months ago (2 children)

At the end of the day, the first thing managers do is convert story points / tshirt sizes / whatever other metaphor back into time estimates. So why bother with the layer of indirection.

I'll die on the hill that most teams do not need scrum / agile and all the ceremony that always goes with it.

A kanban board with a groomed Todo column is all you need. Simple and effective and can easily adapt to unexpected scope changes a.k.a production incidents.

*yes I'm aware that if you're getting bogged down in ceremony you're doing Agile wrong. I've never seen or worked in a place where I've felt it's been done right

[–] [email protected] 2 points 9 months ago

IMO if it is so hard to do right that somehow no company can figure it out, then the whole system must be garbage. The best we can get to is the direct time estimates so that the "velocity" calculations we're graded on make sense. Still going to be bogged down in ceremony no matter what we do tho.

[–] [email protected] 2 points 9 months ago

My company is just doing a kanban board with weekly meetings to discuss the progress and what tickets will be worked on next. The major problem we ran into was when management asked "So, when is the release going to be? When are you done with that project?" about one month before we actually released. I simply had no answer at that point, because that's not something these tickets with no estimates and no velocity tracking can provide.