hono4kami

joined 1 week ago
MODERATOR OF
[–] [email protected] 1 points 4 days ago (1 children)

flixbus exist, which i don’t even understand how they have ridership when they run routes parallel to railways that take like twice as long while obviously being less comfortable…

Would you mind explaining more? How's Flixbus?

[–] [email protected] 2 points 4 days ago

Noted, didn't realize Ray was on Mastodon too

[–] [email protected] 39 points 4 days ago (16 children)

That's why when I left reddit I don't delete my posts (even if those posts suck)

Bonus:

a screenshot of deleted reddit comment with a reply thanking the parent commenter

[–] [email protected] 3 points 4 days ago (1 children)

Is it true that you actually have to add a parking space as a building owner in US? lol

[–] [email protected] 217 points 4 days ago* (last edited 4 days ago) (16 children)

As a software engineer...

Don't just say "just Google it". Guide them to the documentation. Ask them about the detail of the question. If it's an bug, try asking them if they can reproduce the bug.


This reminded me of the time I'm looking for how to do certain things in a software. I found a reddit post asking about the same issue and this is the reply OP got:

screenshot of a reddit thread where OP got a rude reply to search it themselves

Here is the link: https://old.reddit.com/r/i3wm/comments/mupjsf/how_to_showhide_i3status_bar_taskbar/

Imagine. You search the issue you have. Found the ONLY reddit thread that talks about this, and the ONLY thread that talks about the issue have NO USEFUL ANSWER and, worse, the only reply is TELLING YOU TO SEARCH IT YOURSELF. This got upvoted too 😭😭😭.

Luckily, I found the solution (tbh the solution was there in the docs, but the wording wasn't clear and it makes it hard to search) and I end up replying the OP the actual answer.

So, this is a PSA for the fediverse: be nice. It's free.

While we're still young, we have a chance to become a better forum.

Also possibly an unpopular opinion: you shouldn't downvote a question, even if it was asked multiple times. Guide them to the answer instead

[–] [email protected] 1 points 4 days ago (1 children)

I assumed the parent commenter meant this: https://en.wikipedia.org/wiki/Compartment_coach

But if the commenter meant cross-seat trains like this:

cross seat train from Japan

then yeah it exists

[–] [email protected] 2 points 4 days ago* (last edited 4 days ago) (1 children)

I think we should stop saying "lobbying" and start saying "corruption" or "bribing" isntead

[–] [email protected] 3 points 4 days ago (1 children)

Yeah, EV batteries and very narrow tunnel (so narrow you can't open the car door apparently) is a bad combination

[–] [email protected] 2 points 4 days ago

Noted, I intentionally didn't limit it to English, it would be good to see non-English speaking part of fediverse after all

[–] [email protected] 4 points 4 days ago (4 children)

EV batteries fire + narrow place seems like the worst ever combo

How the heck is this project even approved lol

[–] [email protected] 2 points 4 days ago

Ahh found one. Adding it to the list.

 

If you are interested on becoming a moderator here, feel free to send me a DM


To dos:

  • [ ] Write community description
  • [ ] Write community rules
  • [ ] Write related communities in sidebar
  • [ ] Look for moderators
 

Pictured: Wuling Binguo EV, one of the EV car I most often see in Jakarta and Surabaya, Indonesia. I also am beginning to see BYD EV cars in Jakarta too

By Andra Febrian - Own work, CC BY-SA 4.0, https://commons.wikimedia.org/w/index.php?curid=145229895

As an Indonesian, I am kinda surprised to see at least like one or two EV each day in Jakarta and Surabaya, especially when EVs here are still considered expensive cars.

I am also surprised seeing more EVs than hybrid cars here

 

The election, the CEO murder, etc.

And when I tried to say something about it, I get downvoted, and get replies that I am a bootlicker or something etc.

Oh yeah, also, Lemmy discussion is very one-sided and lacks nuance.

I have more things to say, but I prefer sleeping. That's all

12
submitted 1 week ago* (last edited 1 week ago) by [email protected] to c/[email protected]
 

illustration of Thorcon 500 prototype power plant at Kelasa Island, Indonesia

The plan for introducing liquid fission power to Indonesia has two parts. Phase 1 is to build and test a 500 MW Thorcon 500, with step by step commissioning, ending in an approved type license for future power plants. Phase 2 is shipyard production of six Thorcon 500 plants to help Indonesia’s utility company provide an additional 3 GW of cheap, reliable electric power to support economic development.

The conceptual design phase has been completed, computationally modeled, expressed in 2D drawings and 3D CAD models, and shared with potential suppliers. Suppliers’ cost estimates for future production versions are compatible with company estimates of electricity production costs, well under those from coal-fired power plants.

The 500 MW power plant will be built in a world-class shipyard experienced in high-quality, cost-competitive steel-working. ThorCon will rely on the yard for detailed design outside the Can, production scheduling, and much of the equipment purchasing functions. The shipyard will be ThorCon’s EPC (engineering, procurement, construction) contractor. The expensive, massive, precision supercritical steam turbine-generator must be pre-ordered to achieve the one-year shipyard build time.

The shipyard will construct and outfit the two hulls that comprise the Thorcon power plant. These are the steam module containing the supercritical steam turbine generator, and the nuclear module with two power modules, each with two replaceable Cans. The nuclear reactor Pots are in the Cans, which will be fabricated by companies with nuclear industry experience.

Non-fission testing. The first nuclear module produced by the shipyard will be outfitted with a Can for nonfission testing, without enriched uranium in the fuel salt. Electrically powered resistance heaters are sized to heat components up to operating temperatures.

The fuel salt will not contain enriched uranium and will not sustain a chain reaction to generate power. The components will be brought up to operating temperatures using electric heating. The absence of radioactivity allows intrusive instrumentation, direct observation, and internal access to components.

Extensive testing will include operating pumps at full temperatures and pressures, drains to drain tanks, actuation of shutdown rods, and instrumentation. Motors, pumps, seals, and valves for molten salt flows will be tested. Engineers will measure thermal expansion, confirm heat transfer rates, verify thermal hydraulics characteristics, test sensors, transfer molten salts between the Pot and fuel casks. System responses to simulated failures will be monitored closely.

If testing reveals needs for changes, the nuclear module and/or Can will be returned and revised by their manufacturers. Thorcon 500 prototype power plant at Kelasa Island, Indonesia

Fission testing. The ThorCon 500 nuclear module and steam module will be towed to the Indonesia near-shore site prepared with breakwaters and seawater cooling piping and a connection to the PLN electric power grid.

Step-by-step commissioning will then be used to gradually reduce uncertainties and increase fission power levels. Working closely with Indonesia’s nuclear regulator (Bapeten) and expert test approvals committee (TAP), ThorCon engineers will proceed with step by step commissioning, fueling the plant, bringing the reactor to zero-power criticality, then increasing power levels as testing confirms safe, effective power generation.

Stress tests. ThorCon is designed to react safely to many operational events and failures. Demonstrating safety is important to public acceptance of fission power. Test examples include sudden loss of load, overheating the fuelsalt, losing chimney radiator cooling, and failure of shutdown rods. These tests are possible because of multiple layers of defense in the design. The TAP must pre-approve all such tests, continuing the step by step commissioning process.

Mass production. When testing is successfully completed, the company expects Indonesia’s Bapeten regulator to refine its regulations and issue a type license citing the design as safe for similar future power plants. Indonesia’s PLN utility company will sign a power purchase agreement (PPA) with Thorcon, which will build, install, and operate 3 GW of additional Thorcon 500 power plants. The PPA will enable financing with traditional loans. As these plants are put into operation the company expects world-wide orders for such shipyard-constructed power plants that deliver nonstop electric energy cheaper than coal.

view more: ‹ prev next ›