KaBoxVN

joined 9 months ago
[–] [email protected] 1 points 9 months ago

Yesterday I read it, now I can not find the link, but from posts of experts , they said it's difficult , need more time and TSMC has tools to convert...

[–] [email protected] 1 points 9 months ago (3 children)

Next gen 5090 is ready but delay due to new structures on 3nm TSMC, much of time to re-code and convert. I read some media talking about more and more difficult on 2nm in future. So maybe afraid no enough time for 2025 if engineers head on time over time in extremely positive effects. Maybe the limit of technology has come. Media talks 2nm maybe over 2030.

[–] [email protected] 1 points 9 months ago

Oh China is dragon.

Loongson-3A5000 is dragon too. A son of Loncin and Sino wave. I doubt.