this post was submitted on 23 Nov 2023
1 points (100.0% liked)

Framework

68 readers
1 users here now

Discussion around the Framework mission of building products that last longer by making them upgradeable, customizable, and repairable. Consumer electronics can be better for you and for the environment.

founded 11 months ago
MODERATORS
 

Anyone else in a similar position?

  • Ordered 13/9
  • Preparation email 15/11
top 3 comments
sorted by: hot top controversial new old
[–] [email protected] 1 points 10 months ago

Same here it took two weeks before payment and shipping.

[–] [email protected] 1 points 10 months ago

In Canada and no payment taken yet, ordered Sep 20 but I modified my order the day after the preparation email so that probably moved me further back in the line.

[–] [email protected] 1 points 10 months ago

Batch 7, Netherlands. Got an email saying that my payment method didn't work two days ago. Fixed that just now (i.e. transferred the funds), and immediately received an email about them preparing my shipment.

  • Preparation email 15/11