Intel
Rules
-
Be civil. Uncivil language, slurs, and insults will result in a ban. If you can't say something respectfully, don't say it at all.
-
No Unoriginal Sources, Referral links or Paywalled Articles.
-
All posts must be related to Intel or Intel products.
-
Give competitors' recommendations only where appropriate. If a user asks for Intel only (i.e. i5-12600k vs i5-13400?) recommendations, do not reply with non-Intel recommendations. Commenting on a build pic saying they should have gone AMD/Nvidia is also inappropriate, don't be rude. Let people enjoy things.
-
CPU Cooling problems: Just like 95C is normal for Ryzen, 100C is normal for Intel CPUs in many workloads. If you're worried about CPU temperatures, please look at reviews for the laptop or CPU cooler you're using.
view the rest of the comments
It totally depends on what chips are outsourced. Intel has been a TSMC customer for many years.
Intel 4 and Intel 20A are not library complete nodes - they're optimized specifically for x86 compute tiles. Intel 3 and 18A are the refined, library complete versions of these nodes.
Lunar Lake combines NPU, iGPU, and Compute on a single tile, so Intel 4 and 20A are not viable nodes. Arrow Lake has Compute on its own tile, so it's using 20A. Lunar Lake either be delayed 6 - 9 months and wait for 18A, or it can launch on TSMC N3. N3 was likely a better choice than Intel 3 - either due to capacity constraints (Granite Rapids and Sierra Forest will be launching on Intel 3 in the same year), or it could be due to performance (N3 could just be better suited for GPU - or it would be too costly to try to and port the Arc iGPU to Intel 3 just for Lunar Lake).
โ
Intel's business structure has changed. Their nodes and design teams aren't working tightly together anymore like in the past, where Intel nodes were highly optimized to work with their own designs, and their designs were not portable to other foundries: Intel Fab designs standardized nodes now that compete for customers, and Intel design has more flexibility in which fabs they choose for their now-portable designs. (One recent change is that Intel design teams has to pay for foundry steppings from their own budget, rather than Foundry eating the cost)