this post was submitted on 24 Sep 2023
33 points (100.0% liked)

Aotearoa / New Zealand

1644 readers
23 users here now

Kia ora and welcome to !newzealand, a place to share and discuss anything about Aotearoa in general

Rules:

FAQ ~ NZ Community List ~ Join Matrix chatroom

 

Banner image by Bernard Spragg

Got an idea for next month's banner?

founded 1 year ago
MODERATORS
 

Battery electric hybrid, to be exact, with no diesel involved. Scheduled to arrive 2028-2029

you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 1 points 1 year ago (1 children)

Yeah, I've heard this issue before. Is it too much to ask that we think of these things before substantial investment? Wellington has just replaced a significant amount of their overhead lines.

[–] [email protected] 2 points 1 year ago (1 children)

There's a big difference between renewing the existing lines, and completely changing the system. You're increasing the operating voltage more than 10x, the insulators and clearance required would be huge. You'd have to raise bridges, lower the floors of tunnels, completely renew the poles, lines, and insulators, all while keeping the lines running during the day.

Not only that, but this would require massive alterations to the rolling stock once the change happens, which would have to be done all at once after you switch voltages.

I understand the sentiment, but it would be an absolute boondoggle.

[–] [email protected] 2 points 1 year ago

Oh yes, of course it would be a massive job. But I'm just saying, maybe someone should have a plan. As far as I can tell, no one has a unified plan for what we want our rail network to look like in 50 years.