this post was submitted on 14 Feb 2025
44 points (100.0% liked)

London

1082 readers
69 users here now

"who’d a thunk it"

For discussion about London including the surrounding Greater London area. Discuss all things from news, travel, culture, and general life around the capital and largest city of England!

Rules and other welcoming info can be found here.

founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 8 points 1 week ago

London's new £5bn super sewer has been fully connected and is already stopping half a million tonnes of sewage from entering the River Thames, the firm behind it has said.

After 10 years of construction work, the last of the 21 connections of the Thames Tideway Tunnel was made to the city's Victorian sewage system.

The 16-mile (25km) pipe will divert 34 of the most-polluting sewage outflows that have been discharging into the Thames.

Tideway chief executive Andy Mitchell said: "This is another significant step forward – with this final connection complete, the super sewer is fully up and running and protecting the Thames."