this post was submitted on 12 Nov 2024
533 points (96.7% liked)

Technology

60084 readers
2696 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 145 points 1 month ago* (last edited 1 month ago) (4 children)

Amateurs.

The 1963 Černý Důl – Kunčice nad Labem aerial ropeway is over 8 km (5 mi) long, over 30 m high in places and carries 135 tons of limestone every hour from a quarry to the nearest train station. Its 120kW 3-phase synchronous motor requires power for a few minutes at the start and end of each day when most of the 800kg-capacity trolleys are empty, and spends most of the shift generating mains electricity and acting as a speed governor. Unlike the EV, it is fully autonomous most of the way, only 5 people are required to operate it. (Loading, unloading and timed dispatching is automatic, arriving/leaving carts just need to be checked; a safety latch has to be manually dis/engaged on trolleys passing the check.) The quarry will continue operation as long as it pays off, then the ropeway will be scrapped (projected 2033). A dude illegally rode the way up on it somewhat recently. He could have fallen to his death if he pulled the latch.

[–] [email protected] 14 points 1 month ago (4 children)

I wouldn't be surprised if there are electrified railway lines doing the same. Regenerate large amounts of energy into the grid while descending loaded; consume a relatively small amount of energy to haul the empty train back uphill.

[–] [email protected] 7 points 1 month ago* (last edited 1 month ago) (1 children)

An early version of the Petřín ropeway in Prague used to contain tanks in both cars. The upper one would be filled with ~~sewage~~ collected rainwater from the city's hilltop quarter and the energy of the descent was used to pull the other car up. Additionally, the way up cost twice as much so there was an incentive to ascend on foot, which was about as fast despite the incline.

[–] [email protected] 4 points 1 month ago

I don't know about going downhill in general, but there are some that use regenerative braking (regular braking, on flat terrain) so maybe

[–] [email protected] -5 points 1 month ago (1 children)

Most mines are underground so for most this can't work, but where it does they are sure to use it.

[–] [email protected] 3 points 1 month ago

Regular trains don't run underground. Lots of opencast mines exist .

Basically all mines have an above ground terminal where whatever you mined is unloaded from your underground trains, lifts, haul trucks or whatever else onto storage piles, then loaded onto the actual long distance trains.

If the mine entry is up a mountain, then the trip down from that point will be a net energy producer regardless of anything else.

[–] [email protected] 8 points 1 month ago* (last edited 1 month ago)

Content aside, what a great video! It's not that old of a video but it reminds me so much of early YouTube, just friends messing around and posting it with top tier song choice.

[–] [email protected] 4 points 1 month ago

Damn, that shit is even hotter

[–] [email protected] 2 points 1 month ago (1 children)
[–] [email protected] 3 points 1 month ago

I know, this one is shorter and has mechanical brakes. Not as great but I imagine the Czech one, one of the largest in Europe, has very few English-language sources that could have pointed it out to him. I don't know whether the Claughton one cannot be ridden or Tom is just squeamish about safety (see description) but the Černý Důl one definitely can, that's how they do routine inspections.