this post was submitted on 15 Oct 2024
526 points (98.7% liked)

Technology

58698 readers
4600 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 6 points 15 hours ago* (last edited 15 hours ago) (1 children)

no one’s certain this will be cost-effective either

One of the great sins of nuclear energy programs implemented during the 50s, 60s, and 70s was that it was too cost effective. Very difficult to turn a profit on electricity when you're practically giving it away. Nuclear energy functions great as a kind-of loss-leader, a spur to your economy in the form of ultra-low-cost utilities that can incentivize high-energy consumption activities (like steel manufacturing and bulk shipping and commercial grade city-wide climate control). But its miserable as a profit center, because you can't easily regulate the rate of power generation to gouge the market during periods of relatively high demand. Nuclear has enormous up-front costs and a long payoff window. It can take over a decade to break even on operation, assuming you're operating at market rates.

By contrast, natural gas generators are perfect for profit-maximzing. Turning the electric generation on or off is not much more difficult than operating a gas stove. You can form a cartel with your friends, then wait for electric price-demand to peak, and command thousands of dollars a MWh to fill the sudden acute need for electricity. Natural gas plants can pay for themselves in a matter of months, under ideal conditions.

So I wouldn't say the problem is that we don't know their cost-efficiency. I'd say the problem is that we do know. And for consumer electricity, nuclear doesn't make investment sense. But for internally consumed electricity on the scale of industrial data centers, it is exactly what a profit-motivated power consumer wants.

[–] booly 1 points 19 minutes ago (1 children)

One of the great sins of nuclear energy programs implemented during the 50s, 60s, and 70s was that it was too cost effective.

I don't see how any of this has any bearing on financial feasibility of power plants.

For what it's worth, before the late 90's there was no such thing as market pricing for electricity, as prices were set by tariff, approved by the Federal Energy Regulatory Commission. FERC opened the door to market pricing with its Order 888 (hugely controversial, heavily litigated). And there were growing pains there: California experienced rolling blackouts, Enron was able to hide immense accounting fraud, etc. By the end of the 2000's decade, pretty much every major generator and distributor in the market managed to offload the risk of price volatility on willing speculators, by negotiating long term power purchase agreements that actually stabilize long term prices regardless of short term fluctuations on the spot markets.

So now nuclear needs to survive in an environment that actually isn't functionally all that different from the 1960's: they need to project costs to see if they can turn a profit on the electricity market, even while paying interest on loans for their immense up front costs, through guaranteed pricing. It's just that they have to persuade buyers to pay those guaranteed prices, rather than persuading FERC to approve the tariff.

As a matter of business model, it's the same result, just through a different path. A nuclear plant can't get financing without a path to profit, and that path to profit needs to come from long term commitments.

It can take over a decade to break even on operation, assuming you're operating at market rates.

Shit, it can take over a decade to start operations, and several decades after that to break even. Vogtle reactors 3 and 4 in Georgia took something like 20 years between planning and actual operational status.

Now maybe small modular reactors will be faster and cheaper to build. But in this particular case, this is cutting edge technology that will probably have some hurdles to clear, both anticipated and unanticipated. Molten fluoride salt cooling and pebble bed design are exciting because of the novelty, but that swings both ways.

[–] [email protected] 1 points 16 minutes ago

I don’t see how any of this has any bearing on financial feasibility of power plants

If you don't get a high ROI, you're not going to have lots of investors offering up their cash at low interest rates.