this post was submitted on 20 Nov 2023
0 points (50.0% liked)

Intel

24 readers
1 users here now

Rules

founded 1 year ago
MODERATORS
 
you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 1 points 11 months ago (9 children)

I'm curious as to why it's on TSMC N3. Is it because 20A/18A isn't ready yet or is there another reason?

[–] [email protected] 1 points 11 months ago (2 children)

LNL goes into manufacturing in H1 2024, but 20A will be ready only by H2 2024. Arrow lake will be on both N3B and 20A because 20A is now ahead of schedule.

[–] [email protected] 1 points 11 months ago (1 children)

Will Arrow lake refresh be totally on 20A?

[–] [email protected] 1 points 11 months ago

I'm not sure about arrow lake refresh. Right now, we have 2 versions of Arrow Lake. One on 20A and the other on N3B. Both should launch about the same time but will target different core configurations.

[–] [email protected] 1 points 11 months ago

20A should be manufacturing ready early next year if they are going to launch arrow lake on it in 2024. I suspect it’s already basically done and they are expanding capacity now.

load more comments (6 replies)